This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
{ "VIEW_EXP_P201":{"_all":{"enable":true,"term_vector":"yes","searchAnalyzer":"ik","indexAnalyzer":"ik"},"properties":{"工程编码":{"type":"multi_field","fields":{"工程编码":{"type":"string","store":"yes","term_verctor":"with_positions_offsets","index":"analyzed","indexAnalyzer":"ik","searchAnalyzer":"ik","include_in_all":true,"boost":1},"suggest":{"type":"completion","index_analyzer":"stopword","search_analyzer":"simple","preserve_position_increments":true,"payloads":true}}},"省":{"type":"multi_field","fields":{"省":{"type":"string","store":"yes","term_verctor":"with_positions_offsets","index":"analyzed","indexAnalyzer":"ik","searchAnalyzer":"ik","include_in_all":true,"boost":1},"suggest":{"type":"completion","index_analyzer":"stopword","search_analyzer":"simple","preserve_position_increments":true,"payloads":true}}},"地区":{"type":"multi_field","fields":{"地区":{"type":"string","store":"yes","term_verctor":"with_positions_offsets","index":"analyzed","indexAnalyzer":"ik","searchAnalyzer":"ik","include_in_all":true,"boost" |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
ElasticSearch.Client.Exception.ElasticSearchException: Method:POST, Url: http://172.16.42.42:9200/test/VIEW_EXP_P201/31110,Body:{"索引时间":"20130906","编号":31110.0,"工程编码":null,"省":"广东省","地区":"江门市","县":"新会区","乡镇":"崖门镇","行政区划代码":"440705105","水库名称":"松仔坑水库","水库编码":"440705000062","东经度":113.0,"东经分":4.0,"东经秒":38.7,"北纬度":22.0,"北纬分":13.0,"北纬秒":17.6,"水资源三级分区":"西北江三角州","水资源三级分区代码":"H070300","所在河流名称":"崖门水道","所在河流代码":"HD2A0000000P","水库类型":"山丘水库","挡水建筑物类型":"挡水坝","按材料分挡水主坝类型":"土坝","按结构分挡水主坝类型":"均质坝","主要泄洪建筑物型式":"岸坡式","坝址控制流域面积":1.9,"坝址多年平均径流量":254.11,"生产安置人口":0.0,"搬迁安置人口":0.0,"工程建设情况":"已建","建成时间年":1964.0,"建成时间月":3.0,"开工时间年":0.0,"开工时间月":0.0,"水库调节性能":"年调节","工程等别":"Ⅴ","主坝级别":"5级","主坝坝高":10.7,"主坝坝长":56.0,"最大泄洪量":38.7,"高程系统":"珠江基面高程系统","坝顶高程":104.7,"设计洪水标准":20.0,"校核洪水标准":200.0,"校核洪水位":104.3,"设计洪水位":103.6,"防洪高水位":0.0,"正常蓄水位":103.2,"防洪限制水位":0.0,"死水位":94.5,"总库容":31.8,"调洪库容":4.8,"防洪库容":0.0,"兴利库容":26.6,"死库容":0.4,"正常蓄水位水面面积":0.01,"工程任务_防洪":" ","工程任务_发电":"1","工程任务_供水":" ","工程任务_灌溉":" ","工程任务_航运":" ","工程任务_养殖":" ","工程任务_其他":" ","重要保护对象":" " |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
{ | |
"COMM_MANDEPTINFO": { | |
"_all": { | |
"enable": "true", | |
"term_vector": "yes" | |
}, | |
"properties": { | |
"UNITNAME": { | |
"type": "multi_field", | |
"fields": { |