THINGS TO OCCUR
Thursday (small team of 2-3)
* If seating is out, retract seating
* Mark out layout in Cube & Bar 2
* DJ riser
* Power
* Network
* Verify facilities (projector etc)
* Lay audio cables (in particular, to Bar 2)
Friday
* Fetch stuff from vault, leave in Bar 2 overnight
* Tables (including taping power to their tops)
* Chairs
* Projector & TV
* Ensure mixing desk from alynn
* Ensure printer from cmalton
* Assemble arena (ELABORATE GREATLY ON THIS)
* Verify Thursday's work
* Verify structural integrity of arena
* Set up computing facilities for:
* compd
* driving of screens
* master facility for thin clients
* Signage:
* Team numbers (with room for the teams to write names on)
* Arena corners?
* No-entry areas (into SUSU offices, bar area, back doors)
* Fire exits
* Toilets
* Reception
* Helpdesk
* Arena entrance
* SR banner
* Audio situation - check amplifier for George and music
* Engineer a camera situation
Saturday morning (before competitors)
* Tea & biscuits, at end of Bar 2
* Distribute laminated cube layout documents to tables
* Distribute name badges
* Signage outside of Bar 2 & Cube
* Re-check Friday's work
* Prepare for arrival
* Ensure reception is staffed (need to pick victims for this: proposed senglish and (bclive or eseabrook)?)
* Ensure helpdesk is staffed (probably sphippen and plaw, maybe with mild trolling from jsanders)
* Play music for great justice
-- competition goes here --
Sunday evening (about 5pm)
* Pack up arena quickly
* Move scaff out of the way - onto fire exit stairwell
* Move hardboard & pine into bar 2
* Take down signage in cube & bar 2
* Take up all computing situation - leave cabling
* Take down TV
* Take down tables & chairs & move into Bar 2 in preparation for putting back into storage
* Take out networking cables
* Take out audio
* Take out power cables
* DJ riser put back into state in which it was found on thursday - probably up
* Take down signage from L4
* Final sweep of cube (including removing all personal kit, to susu reception if necessary)
* Move everything from bar 2 to the vault (everything that belongs in the vault that is)
* Return everything else from bar 2 to ents ⊕ susu
* Final sweep of bar 2
* Clear out signage
* Visit pub
* Imbibe alcohol
Monday morning
* Feel effects of imbibing alcohol
* Return scaff from stairwell area to Harsco
* Jubilation
* Return to bed to nurse headaches