General automotive assets, game-ready chassis, and modular parts.
| Designer/Source | Specialty | Portfolio Link |
|---|---|---|
| Dekogon | Overall Vehicle Assets & Environmental Props | View on CGTrader |
| mswoodvine | Performance-Based Game Ready Vehicles | View on CGTrader |
| brunomcardoso | Classic Vehicle Specialist | View on CGTrader |
| PieEntertainment | Versatile Overall Vehicles | View on CGTrader |
| desmonster | Classic & Modern Vehicle Mix | View on CGTrader |
| anwin | Service & Emergency (Police/EMS/Utility) | View on CGTrader |
| Eccemania | Concept Car Design & Futuristic Vehicles | Explore Eccemania Assets |
| Asset Pack | High-Fidelity Steering Wheels (15 Pack) | View on CGTrader |
- Lead Modeler: Dimitri Jemladenovic (Alias: Dime20 / diime02)
- Contract Rate: $2.40 USD per car.
- Mandatory Deliverables:
- RedBull RB-18 (Max Verstappen)
- Ferrari F1-75 (Scuderia)
- Mercedes AMG W13 (Petronas)
- Portfolios: YouTube | Sketchfab
- Lead Artist: Hamza Ahmed (Alias: Bleedous)
- Directives: Bleedous is officially designated as the lead for all subsequent open-wheel and prototype projects from this point forward.
- Full Scope of Work:
- Formula Series: All F1 fleet expansions (beyond the initial 3), plus full rosters for F2, F3, and F4.
- Electric/Prototypes: All Formula E Prototypes and experimental racing concepts.
- Infrastructure: Global Track Infrastructure and Racing Circuit design.
- Portfolio: ArtStation - Hamza Ahmed
Important
Proprietary Optimization Specs: All models must strictly adhere to the Speedverse performance envelope.
- MAX TRI-COUNT: 45,000 Tris (Must include combined Base Body and Interior).
- Contractual Ceiling: All external contract rates for initial F1 deliverables are locked at $2.40 per unit.
Caution
TOPOLOGY ADVISORY: For accessories such as trailers, police top bar lights, and modular parts, extreme care must be taken to minimize polycounts.
- The lower the topology tri-count, the better. > * Semi-realistic results must be achieved through efficient modeling and texture baking. Do not exceed expected density for secondary assets; optimization is our highest priority for performance stability.