π― Slide Deck: Jira Kanban Reports Explained π¦ Slide 1 β Title
Jira Kanban Reports & Metrics Understanding Flow, Predictability, and Planning
CFD, Cycle Time, Throughput, Burnup Practical insights for Agile teams π¦ Slide 2 β Why These Reports Matter Improve delivery predictability Detect bottlenecks early Enable data-driven planning Replace guesswork with flow metrics π¦ Slide 3 β Core Kanban Metrics Cycle Time β How long work takes Throughput β How much you finish WIP β How much youβre juggling Flow β How smooth delivery is
π These metrics power all Jira reports
π FLOW REPORTS π¦ Slide 4 β Cumulative Flow Diagram (CFD)
What it shows:
Work across statuses over time
Key insight:
Expanding bands = bottleneck Parallel bands = smooth flow
π CFD visualizes workflow stability and bottlenecks
π¦ Slide 5 β Control Chart (Cycle Time)
What it shows:
Each dot = one issue Time to complete (cycle time)
Key insight:
Tight grouping β predictable Wide spread β inconsistent
π Lower variance = higher predictability
π¦ Slide 6 β Throughput
What it shows:
Items completed per time period
Key insight:
Your true delivery capacity Used for forecasting
π Throughput measures completed work over time
π¦ Slide 7 β Created vs Resolved
What it shows:
Incoming work vs completed work
Key insight:
Created > Resolved β backlog growing Resolved > Created β catching up π PLANNING & FORECASTING π¦ Slide 8 β Burnup vs Burndown
Burndown:
Work remaining over time
Burnup:
Work completed + scope
Key insight:
Burnup is better when scope changes
π Burndown tracks remaining work vs time
π¦ Slide 9 β How These Work Together CFD β Where work is stuck Control Chart β How long work takes Throughput β How much you deliver Burnup β Are you hitting goals
π Together = full system visibility
π¦ Slide 10 β Kanban vs Scrum Metrics Concept Scrum Kanban Velocity β β Forecasting Velocity Throughput Timebox Sprint Continuous Focus Output Flow π¦ Slide 11 β Practical Setup (What to Use)
For most teams:
β CFD (daily monitoring) β Control Chart (retrospectives) β Throughput (forecasting) β Created vs Resolved (health) π¦ Slide 12 β Key Takeaways Flow > velocity in Kanban Predictability comes from cycle time consistency Throughput enables realistic planning Visuals help detect issues early π Want Me to Generate the Actual .PPTX File?