In some cases the IC might determine that a PM meeting for the incident isn't needed.
If the IC decides to waive the meeting please replace the Meeting
section with a
note indicating the meeting has been waived (example: Meeting waived: Paul Mooring
)
- This is a blameless Post Mortem.
- We will not focus on the past events as they pertain to "could've", "should've", etc.
- All follow up action items will be assigned to a team/individual before the end of the meeting. If the item is not going to be top priority leaving the meeting, don't make it a follow up item.
Short explanation of the issue (1 or 2 sentences)
Please note the time to detect and time to resolve and add to the incidents list
Timeline of events, including exact duration of downtime. The timeline should be in chronological order, showing what happened when, but it should also explain what the team knew at the time.
For example, someone deploys a bad build that triggers an alert, but no one initially realizes this is what happened. The timeline should list first that the bad build was deployed, but that the oncall person was not aware of this at the time it occured. Later the timeline might list an event where the oncall person becomes aware this is the case.
Technical explanation of the issue. Should define the contributing factor(s) and why it's an issue.
What specific steps and actions were taken to stabilize the issue. This does not always entail a "fix" as further actions should be listed under "corrective actions"
What was the impact of the incident. This should include the total duration of the outage if applicable.
Action items going forward to fix the issue and reduce chance of contributing factors being an issue.
This MUST include owners/teams assigned to these actions to see them through, and have an issue tracked in this repository (or otherwise linked to external team kanban/issue tracker).
Suggested addition to "Corrective Actions" usually these actions wind up in two categories: immediate and long-term since most issues large enough to have a postmortem will require that the team research a long-term fix and put an implementation plan in place. An out put of two lists with timing for when each item will be completed or reported upon is important to ensuring that the fixes are thoroughly and promptly completed.