Skip to content

Instantly share code, notes, and snippets.

@shofetim
Created November 9, 2015 14:03
Show Gist options
  • Save shofetim/5ca9ba858194e158f725 to your computer and use it in GitHub Desktop.
Save shofetim/5ca9ba858194e158f725 to your computer and use it in GitHub Desktop.

Automation Checklist

Physical System

  • Working air supply?
  • Lines vented, checked for leaks.
  • Bins, belts, and area around sortation system clear of debris.
  • All conveyors can move?
  • Power to accumulation & reject tables

PLC

  • Latest version of the software loaded into memory?

Scanner

  • Scanner bottom glass is cleaned.
  • Any pending software updates from datalogic?

Computers

  • Laptop and printer for one lane
  • Is there still a camara pointed in that direction? How do I access it's video feed?

Operator

  • Someone available this week to run things through on occasion this week?
  • Run wood block for testing?

Other

  • What about the product dimension audit? (pieces where miss measured last time, we have new inventory that may not have been measured, etc)
@stephen-azure
Copy link

Jordan, all items under Physical System, PLC and scanner are completed. We had a power outage the other night and the HMI looks to be borked so we can't do certain testing via that.
Camera is offline for now. You can coordinate with Joe for some assistance in testing.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment