- Sort pipes in pole barn into "use" and "not use".
- "use" go to greenhouse site.
- "not use" go (?) over the electric fence (?)
- Lay out site.
- Ensure the corners are in the right place.
- Run string.
- Pound in posts. Use a level to make sure they're vertical. Make tops of posts all the same height (above sea level).
- Assemble bows/hoops/arches.
- Put up the bows.
- Attach purlins, rafters, etc.
- Build roll-up sides (see instructions from Farm-Tek).
- Put on the baseboards. Attach u-channels.
- Put cover on.
- Put ends on. Or build end-wall.
?? drainage?
- sledge hammer
- carriage bolts
- sockets, wrenches, etc.
- drills
- level
- baling twine
- clamps (buy some)
- three tennis balls, baseballs, etc.
- rope